LPG Supply Delay Factor Analysis at PT. Pertamina Terminal LPG Tanjung Sekong
DOI:
https://doi.org/10.35261/gijtsi.v5i01.11298Abstract
PT Pertamina Terminal LPG Tanjung Sekong is a company engaged in petrochemicals, more specifically engaged in the management of Liquefied Petroleum Gas (LPG) terminals in Tanjung Sekong, Merak, Banten. The company is a subsidiary of PT Pertamina International Shipping and has been operating since April 2012. Currently, the increase in gas demand in Indonesia is increasing, it means that the Indonesian people still need gas. In this case, PT Pertamina Tanjung Sekong LPG Terminal has a problem with delays in loading and unloading ships in supplying Liquefied Petroleum Gas (LPG). The delay was triggered by several factors, including administrative constraints, bad weather, and too many ship waiting lists. This study used a fishbone diagram method, Root Cause Analysis (RCA), and 5 Whys to identify the root of the problem. The results of the analysis show that improved ship arrival time predictions, more effective administrative handling, and better weather monitoring can reduce LPG gas supply delays. Recommendations include the development of a time-of-arrival prediction system, increased awareness of the accuracy of administrative data, and cooperation with the Meteorology, Climatology, and Geophysics Agency (BMKG) for better weather monitoring.
Downloads
References
I. Kurniaty and H. Hermansyah, “Potensi Pemanfaatan LPG (Liquefied Petroleum Gas) Sebagai Bahan Bakar Bagi Pengguna Kendaraan Bermotor,” 2016.
V. Kusnandar, “jumlah-penduduk-menurut-provinsi-dan-jenis-kelamin-di-sumatera-(2019),” May 2019.
Subdirektorat Statistik Demografi, Proyeksi Penduduk Indonesia 2015-2045 Hasil SUPAS 2015 [Edisi Revisi]. Jakarta: BPS RI, 2018.
“Undang-undang (UU) Nomor 17 Tahun 2008 tentang Pelayaran,” 2008.
K. Verawati, A. Prasetyo, H. Hamidi, and V. Ladesi, “Analisis Faktor-Faktor Penyebab Terjadinya Keterlambatan Bongkar Muat Coils di PT. Daisy Mutiara Samudra,” Logistik, vol. 15, 2022.
R. Limbong, “Analisis Faktor-Faktor yang Mempengaruhi Saluran Distribusi Lpg Bersubsidi Di Desa Siboro Kecamatan Sianjur Mula Mula Kabupaten Samosir [Skripsi Sarjana, Tidak Dipublikasikan],” 2020.
S. Hanyfah, G. Ryan Fernandes, I. Budiarso, and J. Rayai Tengah Nomor, “Penerapan Metode Kualitatif Deskriptif untuk Aplikasi Pengolahan Data Pelanggan pada Car Wash,” Prosiding Semnas Ristek (Seminar Nasional Riset dan Inovasi Teknologi), 2022.
M. Yusuf, A. Nengah, S. Devi, and F. Azizah, “Analisis Break Even Point (Bep) Sebagai Alat Perencanaan Laba (Studi Pada CV. Langgeng Makmur Bersama Lumajang Periode 2012-2014)”, Jurnal Administrasi Bisnis, 2016.
N. Eviyanti, “Analisis Fishbone Diagram untuk Mengevaluasi Pembuatan Peralatan Aluminium Studi Kasus Pada SP Aluminium Yogyakarta,” JAAKFE UNTAN (Jurnal Audit dan Akuntansi Fakultas Ekonomi Universitas Tanjungpura), vol. 10, no. 1, p. 10, Jun. 2021, doi: 10.26418/jaakfe.v10i1.45233.
R. A. De Fretes, “Analisis Penyebab Kerusakan Transformator Menggunakan Metode RCA (Fishbone Diagram And 5-Why Analysis) Di PT. PLN (Persero) Kantor Pelayanan Kiandarat,” ARIKA: Jurnal Teknik Industri, vol. 16, no. 2, 2022.
D. Rahmawati, R. Suprihardjo, E. Budi Santoso, R. P. Setiawan, K. Pradinie, and M. Yusuf, “Penerapan Metode Rootcause Analysis (RCA) dalam Pengembangan Kawasan Wisata Cagar Budaya Kampung Kemasan, Gresik,” 2016.
M. Rizki and A. Saputra, “Analisa Risiko Supply Chain Management dengan Metode Grey Failure Mode and Effect Analysis dan Root Cause Analysis di PT Pertamina Fuel Terminal Meulaboh,” Serambi Engineering, vol. VII, no. 1, 2022.
Kevin W Knight, CHAIRMAN ISO WORKING GROUP-RISK MANAGEMENT TERMINOLOGY MEMBER STANDARDS AUSTRALIA / STANDARDS NEW ZEALAND JOINT TECHNICAL COMMITTEE OB/7-RISK MANAGEMENT P0 BOX 226, NUNDAH QLD 4012.”
S. Limbong, “Analisis Keterlambatan Kegiatan Ship To Ship (Sts) Pada Nipah Transit Anchorage Area (NTAA) Yang Diageni Oleh PT Adhigana Pratama Mulya”, Jurnal Venus, 2020.
M. Sitompul and E. Darma, “Pengaruh Sistem Pengurusan Dokumen Terhadap Penerbitan Izin Bongkar Muatan Berbahaya di Kantor Kesyahbandaran Dan Otoritas Pelabuhan Oleh PT Sukses Karimun Jaya Raya,” Jurnal Maritim, vol. 1, 2019.
E. Rizky Dwiano, I. Pujo Mulyatno, and S. Joko Sisworo, “Analisis Risiko Pada Proses Bongkar Muat Dengan Metode Analytical Hierarchy Process (AHP) dan Fault Tree Analysis (FTA) di PT. ABADI JAYA MARITIM,” Jurnal Teknik Perkapalan, vol. 9, no. 2, p. 162, 2021, [Online]. Available: https://ejournal3.undip.ac.id/index.php/naval
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Alyani Zalfaa, Riska Fitriani, Melia Handayani, Alifia Sri Prasetiowati, Zaki Abdul Ghani, Rubby Rahman Tsani, Anisa Yuli Rahmawati
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.