indonesia
DOI:
https://doi.org/10.35261/gijtsi.v4i02.10876Abstract
Project scheduling can help to show the relationship between the activities carried out by the project. This scheduling also functions to prioritize the travel process of a previous activity before the next activity is carried out. One scheduling method that can be used is CPM (Critical Path Method). This research aims to evaluate house construction projects in Perumnas Karawang Regency. In this research, the data taken is primary data and secondary data. Primary data was obtained directly from interviews between homeowners and researchers. The results of this research discussion showed that the critical path results were A-B-C-D-G-H-I-J-K with details of activities: preparing materials, installing foundations, assembling and installing metal slup, installing hebel, plastering walls, plastering walls, painting walls, installing ceilings and installing ceramics. Scheduling house construction projects in Perumnas Karawang Regency using the CPM method can be completed within 60 days.
Downloads
References
Caesaron And Thio, "Analisa Penjadwalan Waktu Dengan Metode Jalur Kritis Dan PERT Pada Proyek Pembangunan Ruko (Jl. Pasar Lama No.20, Glodok).," JIEMS (Journal Of Industrial Engineering & Management Systems), Vol. 8, No. 2, Pp. 59-82, 2015.
A. Ganesstri. Padma And P. Nia Budi, "Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan (Studi Kasus : Qiscus Pte Ltd).," J@Ti Undip: Jurnal Teknik Industri, Vol. 12, No. 3, Pp. 189-196, 2017.
Iwawo, R. Ezekiel, J. Tjakra And P. A. Pratasis, "Penerapan Metode Cpm Pada Proyek Konstruksi (Studi Kasus Pembangunan Gedung Baru Kompleks Eben Haezar Manado)," Jurnal Sipil Statik, Vol. 4, No. 9, Pp. 551-558, 2016.
N. Saputra, E. Handayani And A. Dwiretnani, "Analisa Penjadwalan Proyek Dengan Metode Critical Path Method (Cpm) Studi Kasus Pembangunan Gedung Rawat Inap Rsud Abdul Manap Kota Jambi.," Jurnal Talenta Sipil, Vol. 4, No. 1, Pp. 44-53, 2021.
H. A. And W. H., "Perencanaan Perkerasan Kaku (Rigid Pavement) Untuk Peningkatan Ruas Jalan Brebes –Jatibarang Kabupaten Brebes.," Infratech Build. J, Vol. 1, No. 1, Pp. 1-10, 2020.
G. A. N. Wahidin, "“Analisis Laju Sedimentasi Dan Konservasi Di Hulu Waduk Malahayu,”," Infratech Build. J., Vol. 1, No. 1, Pp. 29-35, 2020.
H. A. And S. A., "“Identifikasi Kerusakan Jalan Pada Jalan Larangan Pamulian Kabupaten Brebes,”," Infratech Build. J., Vol. 1, No. 01, Pp. 21-28, 2020.
D. Eka And B. Sudaryanto, Optimalisasi Pelaksanaan Proyek Dengan Metode Pert Dan Cpm Studi Kasus Twin Tower Building Pasca Sarjana Undip), Doctoral Dissertation, Universitas Diponegoro, 2011.
A. Y. Pratama And I. A. N. Kartini, "Analisis Perencanaan Dan Penjadwalan Proyek Pembangunan Rumah Kos Menggunakan Network Planing Pert Dan Cpm Di Kota Surabaya," Jurnal Ekonomi Manajemen (Jemi 7), Vol. 5, No. 1, Pp. 19-32, 2020.
A. Siregar And I. Iffiginia, "Penggunaan Critical Path Method (Cpm) Untuk Evaluasi Waktu Dan Biaya Pelaksanaan Proyek," Teknika: Jurnal Sains Dan Teknologi, Vol. 15, No. 2, Pp. 102-111, 2019.
E. R.M, Iwawo, J. Tjakra And Pingkan, "Penerapan Metode Cpm Pada Proyek Konstruksi (Studi Kasus Pembangunan Gedung Baru Kompleks Eben Haezer Manado)," Jurnal Sipil Statistik, Vol. 4, No. 9, Pp. 551-558, 2016.
I. A. Kusumadarma, D. Pratami, I. P. Yasa And T. Wawan, "Developing Project Schedule In Telecommunication Projects Using Critical Path Method (Cpm)," International Journal Of Integrated Engineering, Vol. 12, No. 3, Pp. 60-67, 2020.
I. Habibi, F. Z. Nugraha And Sutrisno, "Penerapan Critical Path Methodpada Penyelesaianproyek Rehabilitasi Jalan Parigi Lama Di Kabupaten Sumedang," Go-Integratif : Jurnal Teknik Sistem Dan Industri , Vol. 04, No. 01, Pp. 1-10, 2020.
I. Venn Yan Ishak, D. Rahakbauw And J. Tetimelay, "Penjadwalan Waktu Proyek Pembangunan Rumah Dengan Menggunakan Cpm (Critical Path Method).," Barekeng: Jurnal Ilmu Matematika Dan Terapan, Vol. 12, No. 2, Pp. 61-68, 2018.
M. P. Nanda, M. Kurniawati And S. Riswanto, " Penggunaan Metode Project Evaluation Review Technique (Pert) Dalam Evaluasi Perencanaan Penjadwalan Proyek," Jurnal Teknik Sipil, Vol. 17, No. 3, Pp. 163-173, 2023.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Radyta Sigit, Figar Wafiq Al-Muqaffa, Sutrisno Sutrisno
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.