PERFORMANCE ANALYSIS OF PRESS PROGRESSIVE MACHINE USING OVERALL EQUIPMENT EFFECTIVENESS METHODS IN METAL STAMPING COMPANY

Authors

DOI:

https://doi.org/10.35261/barometer.v8i2.7292

Abstract

The problem that is commonly found in manufacturing companies is how to carry out the production process effectively and efficiently. Especially doing maintenance on machines to get optimal production results. The P1-29 machine is one of the machines from a metal stamping company that produces automotive parts with stamping as the main process. The P1-29 machine is often unusable for the production process due to downtime. This study aims to determine  factors that can cause downtime on the P1-29 machine in order to reduce the downtime. Therefore, an appropriate concept is needed to identify the performance of the production process with optimal effectiveness, efficiency and reducing the downtime. This appropriate concept is called by the Overall Equipment Effectiveness (OEE) method assisted by Pareto diagrams, fishbone diagrams, also kaizen five-m checklist and 5W + 1H analysis. The OEE value of the P1-29 engine for the period January-March 2022 is 62%. From this value, it can be seen that the OEE level does not meet the standards set by JIPM, which is >85%. The factors causing downtime on the P1-29 machine consist of various factors from the six big losses with the highest factor being the setup and adjustment losses of 17.47%. From the results of the fishbone diagram analysis, the factors that lead to the high value of setup and adjustment losses consist of human, material, machine, method and environmental aspects.

Downloads

Download data is not yet available.

Author Biographies

Wahyudin Wahyudin, Universitas Singaperbangsa Karawang

Program Studi S1 Teknik Industri Fakultas Teknik Universitas Singaperbangsa Karawang

Muhammad Reza Aldiansyah, Universitas Singaperbangsa Karawang

Program Studi S1 Teknik Industri Fakultas Teknik Universitas Singaperbangsa Karawang

Sutrisno Sutrisno, Universitas Singaperbangsa Karawang

Program Studi S1 Teknik Industri Fakultas Teknik Universitas Singaperbangsa Karawang

References

S. Hastary, ) Ayus, A. Yusuf, R. Awaludin, dan U. Kuningan, “OPTIMALISASI PROSES PRODUKSI DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (Survey pada PT. Arteria Daya Mulia Kota Cirebon) 1),” vol. 14, no. 1, hal. 119–130, 2021.

S. H. Santosa, S. Irawan, dan I. Ardani, “Determination of Overall Equipment Efectiveness Superflex Machine Using Fuzzy Approach,” Int. J. Artif. Intell. Res., vol. 4, no. 2, 2021, doi: 10.29099/ijair.v4i2.142.

R. Saputra dan D. T. Santoso, “Analisis Kegagalan Proses Produksi Plastik Pada Mesin Cutting Di Pt. Fkp Dengan Pendekatan Failure Mode and Effect Analysis Dan Diagram Pareto,” Barometer, vol. 6, no. 1, hal. 322–327, 2021, doi: 10.35261/barometer.v6i1.4516.

S. N. Susianti, “Analisis Perawatan Mesin Casting Zinc Menggunakan Metode Overall Equipment Effectivness (OEE) Melalui Pendekatan DMAIC,” JENIUS J. Terap. Tek. Ind., vol. 1, no. 1, hal. 30–37, 2020, doi: 10.37373/jenius.v1i1.22.

E. K. Karmilawati, K. M. Mulyono, dan S. N. Nugroho, “Pendekatan OEE (Overall Equipment Effectiveness) Untuk Mengurangi Losses Pada Mesin Moulding Cerex,” J. Optimasi Tek. Ind., vol. 3, no. 2, hal. 46, 2021, doi: 10.30998/joti.v3i2.8576.

A. Wahid dan R. Agung, “Perhitungan Total Produktifitas Maintenance (TPM) pada Mesin Bobin dengan Pendekatan Overall Equipment Effectiveness di PT. XY,” J. Knowl. Ind. Eng., vol. 3, no. 3, hal. 40–49, 2016.

Supriyati dan H. Hardi Purba, “TPM Implementation in Automotive Component Manufacturing Companies to Analyze Efficiency Injection Machine,” J. Appl. Res. Ind. Eng., vol. 6, no. 4, hal. 294–313, 2019, doi: 10.22105/jarie.2020.208271.1112.

S. Nakajima, Introduction to TPM: total productive maintenance. Cambridge: Productivity Press, 1988.

R. Riansyah dan R. A. Darajatun, “Proses Stamping Press Pembuatan Part Bracket Harness (Studi Kasus di PT. Ichii Industries Indonesia),” J. Ilm. Wahana Pendidik., vol. 8, no. 3, hal. 1–5, 2022.

I. M. I. W.C.S, M. Darsin, dan M. Edoward R, “APLIKASI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM UPAYA MENGATASI TINGGINYA DOWNTIME PADA STASIUN KETEL DI PG X JAWA TIMUR,” Multitek Indones. J. Ilm., vol. 13, no. 2, hal. 95–103, 2019.

M. Irfan, “Analisis Overall Equipment Effectiveness untuk Meningkatkan Keefektifan pada Mesin Press,” J. Indones. Sos. Teknol., vol. 2, no. 7, hal. 1173–1182, 2021, doi: 10.36418/jist.v2i7.194.

S. Priambodo dan N. A. Mahbubah, “Implementasi Metode Overall Equipment Effectiveness Berbasis Six Big Losses Guna Mengevaluasi Efektivitas Mesin Packing Semen,” J. Serambi Eng., vol. 6, no. 4, hal. 2363–2374, 2021, doi: 10.32672/jse.v6i4.3497.

D. Wibisono, “Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ),” J. Optimasi Tek. Ind., vol. 3, no. 1, hal. 7–13, 2021, doi: 10.30998/joti.v3i1.6130.

F. Kurniawan, Manajemen Perawatan Industri: Teknik dan Aplikasi Implementasi Total Productive Maintenance (TPM), Preventive Maintenance dan Reability Centered Maintenance (RCM), 1 ed. Yogyakarta: Graha Ilmu, 2013.

R. F. Prabowo, H. Hariyono, dan E. Rimawan, “Total Productive Maintenance (TPM) pada Perawatan Mesin Grinding Menggunakan Metode Overall Equipment Effectiveness (OEE),” J. Ind. Serv., vol. 5, no. 2, 2020, doi: 10.36055/jiss.v5i2.8001.

I. M. A. Anthara, “Analisa Usulan Penerapan Total Productive Maintenance (TPM)(Studi Kasus Di Divisi Mekanik Perum Damri Bandung).,” 2013.

O. Yemima, D. A. Nohe, dan Y. N. Nasution, “Penerapan Peta Kendali Demerit dan Diagram Pareto Pada Pengontrolan Kualitas Produksi ( Studi Kasus : Produksi Botol Sosro di PT . X Surabaya ),” J. EKSPONENSIAL, vol. 5, hal. 197–202, 2014.

V. Gaspersz, Manajemen Produktivitas Total, Strategi Peningkatan Produktivitas Bisnis Global. Jakarta: Gramedia Pustaka, 1998.

P. Hamda, “Analisis Nilai Overall Equipment Effectiveness (Oee) Untuk Meningkatkan Performa Mesin Exuder Di Pt Pralon,” J. Ilm. Teknol. dan Rekayasa, vol. 23, no. 2, hal. 112–121, 2018, doi: 10.35760/tr.2018.v23i2.2461.

Published

2023-08-01

How to Cite

Rifa’i, M. R., Wahyudin, W., Aldiansyah, M. R., & Sutrisno, S. (2023). PERFORMANCE ANALYSIS OF PRESS PROGRESSIVE MACHINE USING OVERALL EQUIPMENT EFFECTIVENESS METHODS IN METAL STAMPING COMPANY. Barometer, 8(2), 68–77. https://doi.org/10.35261/barometer.v8i2.7292